A full 4X8 sheet of 3/4 Starboard ready to go on the router.
Today was clean up day in the shop. After four days of sanding the shop was a dust bowl. Pete Johnston came by with his leaf blower and we set him up on scaffolding and he cleaned the joint up. George wet mopped the floor and we set up for Starboard cutting.
This is your new blog post. Click here and start typing, or drag in elements from the top bar.