Skimmeroutdoors.com
  • Home
    • Home 2013
    • Links
  • Reports
    • User Fishing Reports >
      • Upload a Fishing Report
    • Hunting Reports >
      • Upload a Hunting Report
    • Regulations
  • Adventures
    • Travel Log
  • Charter Capt. Al
  • TV
  • Boating
    • Another Mako Restoration
    • For Sale
  • Contact Us
    • Stock Photography

Cutting Starboard for the new Mako project. Onion skin technique.

2/17/2011

1 Comment

 
1 Comment

CNC routing of Starboard parts for Tony's boat

2/16/2011

2 Comments

 
Picture
A full 4X8 sheet of 3/4 Starboard ready to go on the router.

Picture
Today was clean up day in the shop. After four days of sanding the shop was a dust bowl. Pete Johnston came by with his leaf blower and we set him up on scaffolding and he cleaned the joint up. George wet mopped the floor and we set up for Starboard cutting.

This is your new blog post. Click here and start typing, or drag in elements from the top bar.
2 Comments

Post Title.

2/14/2011

1 Comment

 
Picture

2/14/2011Tony's Mako took the trip to the paint show today. In about a week it should be looking good and ready for the finish work

This is your new blog post. Click here and start typing, or drag in elements from the top bar.
1 Comment

Post Title.

2/10/2011

0 Comments

 
Picture
2/10/2011

Today we finished sanding the entire boat. It is now ready to go to the paint shop where Matt at Perfect Ten Auto will transform it into a new looking boat. 

All holes, dings and scratches have been filled and the entire boat sanded to a 120 grit finish.

It will be done in Awl Grip paint with a pale green Aqua Mist hull and Oyster White topside.

Picture
The console, transom door and front storage hatches went to the paint shop today. While the boat is being painted I will get to work on setting up the console for wiring and non-skid finishing the hatches and transom door.

0 Comments

Setting gas tank coffin cover

2/1/2011

0 Comments

 
Picture

The almost finished product. Tank coffin cover on and epoxy with cabosil layered to fill the void. We decided to lock it in as all sealants like silicone, 4200 etc all shrink with time and let water in. This will keep it all out and if we ever need to remove the hatch we can do it with a skill saw and a pry bar. You can always fix what you messed up on the first time. There is always a way.

Picture
Here is Pete drizzling some epoxy slurry into the void of the coffin cover and the main deck

Picture
Pete the chemist mixing the West System epoxy and fluffing with cabosil.

Picture
All tank fittings and hoses connected and ready for the cover. The only one remaining is the pick up tube but that can be done later after painting.

Picture
We engineered a pressure test kit to check the integrity of the full pipe. On my boat one of the pipes running from the deck fill to the tank was ruptured and gas would leak. We wanted to make sure that it was not broken so George made up a system of plugs and air pressure to make sure the fill we are using is not cracked.

I left the alternate fill pipe and vent for the second tank in tack so that if the primary leaks we can shift it to the secondary tank fill and vent.


A good day at the shop.

Captain Al Lorenzetti

0 Comments

    Capt. Al Lorenzetti

    Fishing and hunting for 50 years and now in the boat restoration business. Lots of fun.

    (Click here to see the restoration of the Skimmer )

    Archives

    April 2011
    March 2011
    February 2011
    January 2011
    December 2010

    Picture
    Picture
    Picture

    RSS Feed

© 2014 skimmeroutdoors.com